Chinese high-speed rail network control system might have been placed on the United States Secret "worm"
Original Source - http://junshi.xilu.com/2011/0726/news_44_177187.html
google translation (chinese -> English) - http://translate.google.com/translate?tl=en-us&u=http%3A%2F%2Fjunshi.xilu.com%2F2011%2F0726%2Fnews_44_177187.html
Original Source - http://junshi.xilu.com/2011/0726/news_44_177187.html
google translation (chinese -> English) - http://translate.google.com/translate?tl=en-us&u=http%3A%2F%2Fjunshi.xilu.com%2F2011%2F0726%2Fnews_44_177187.html
According to materials provided by China Railway, Beijing-Shanghai high-speed rail catenary lightning protection technology used, electrical melting technology to improve the overall performance of disaster, being the case, why are still being struck by lightning? China Railway Electrification Bureau of Propaganda Minister Wang Zhijian said by phone yesterday, the situation is not as simple as you might imagine, the phone, a two can not explain.
Wenzhou Bridge fall rear-end motor car accident scene
Repair the power grid, according to a senior engineering class said they spent a half hour to repair the catenary failure, and pointed out that this is not an ordinary lightning. Because most of the lightning strike will cause momentary short circuit, a few seconds to recover, and the resulting long catenary power, there is only one possibility that the power control system malfunctioned, the software failure. According to another set of control system for check-ups on the grid system engineers found that there is a lot of data anomalies, is likely to encounter malicious software.
At present, the power control system of this invasion of the "worm" virus has been extracted and sent to the National Computer Network and Information Security Management Center for further testing, according to preliminary analysis of results, this worm invaded Iran in November last year Centrifuge control system similar to the first record of the normal voltage data, the attack is successful, the voltage control until the train paralysis. To achieve maximum destructive effect, the virus while the normal voltage to the monitoring device sends data, so that the alarm system, monitoring personnel can not be detected in time. The train stopped so that when the network control center personnel also think that everything is normal, do not know what happened, is a phone call from the control room out of the question to know the problem.
According to an official of the National Security Bureau said they have mastered some basic information, and said it was a secret operation, jointly sponsored by the United States and Japan. Two computer experts to create the virus, had in May this year, Japan's Shinkansen network control system simulation tests done to ensure that the virus can cause the effective destruction of high-speed rail network.
U.S. President Barack Obama took office, the United States to start the program in China, Beijing-Shanghai high-speed rail is on ordered.
Reported, the United Kingdom and Germany knowingly or unknowingly provided for the manufacture of the virus to help